
May 13, 2012 start of work on Junium Clean Lab. Photo above of is the interior of the Clean lab space for Chris Junium's PaleoClimate Resrearch lab. Picture is taken from the NE corner of the room. This image shows the space post abatement for Asbestos and PCB's and syn demolition phase.

Sept 28, 2012: Above picture taken from same spot as image above. Space is divided. This image shows the interior of Chris Juniums new Paleoclimate/Stable Istope Clean Chemistry Class 10K space. Walls are covered by FRP (fiberglass reinforced panels. Interior Window wall is installed as shown on right side of image. New ductwork in ceiling is all insulated. T-bar ceiling grid is installed in ceiling.

May 13, 2012 Above is a picture taken from the NW corner of the over all space looking back to the south east.

September 28, 2012: Image above taken from the NW corner of the new Junium Paleoclimate/Stable Isotope lab. This image shows the Class 10K CLean Instrument lab. Walls are covered by FRP panels, ductwork is insulated. T-bar ceiling grid is installed. Interior window wall is installed (for tight climate control). Stainless Strut ladder from ceiling to floor will carry electrical and gas services to the Mass Spectrometers. Gases are run through special Swagelok brand 3/8 electropolished and cleaned 3/8" stainless steel tubing.
|